Capabilities Overview

Large-Scale Intelligent Manufacturing Capacity

The company operates two smart manufacturing bases in Jiangsu and Zhejiang, along with a production and service base in Taiwan. With a total production area of approximately 56,000 m² and more than 10 automated processing and intelligent coating lines, the company can achieve peak monthly output of 5,000–6,500 metric tons and has an annual production capacity of 70,000 metric tons of transformer panel radiators.

56,000 m² Production Area
More than 10 lines Automated Processing and Intelligent Coating Lines
5,000–6,500 Tonnes Peak Monthly Production Capacity
70,000 Tonnes Annual production capacity
TQT Manufacturing Bases and Energy Infrastructure
TQT Factory Production Line
Solution Design and Customization Capabilities

Corrosion Protection Solutions Across Multiple Sizes, Materials, and Protection Levels

Available Sizes

Center-to-center distance: 700–5,000 mm
Panel width: 535 mm, 520 mm (recommended), 480 mm, 381 mm

Standard Materials

SPCC Cold-Rolled Steel Sheet
Standard thicknesses: 1.0 mm, 1.2 mm
Maximum thickness: 1.5 mm

Stainless steel

304 and 316 Stainless Steel
Standard thickness: 1.0 mm
Thicknesses up to 1.2 mm available on request

Surface Corrosion Protection Solutions

Hot-Dip Galvanizing / Electrophoretic Coating / Powder Coating / Paint Coating
ISO 1461:2009
ISO 12944 C3L–C5VH

Smart manufacturing

Automation and Digitalization
Smart manufacturing

CNC Horizontal Shot Blasting and Automated Cleaning Line
01 / CNC Shot Blasting and Automated Cleaning
Quality Assurance and Testing Capabilities

Full-process quality control
and Rigorous Testing

Quality Inspection Throughout Transformer Panel Radiator Production
Rigorous Inspection
Throughout Production and Final Product Release
Quality Assurance and Testing System
01

Quality Standards and End-to-End Process Management

Product quality and testing comply with standards including JB/T 5347-2013 and IEC 60076-22-2:2019. Quality management covers the entire process, including manufacturing, welding, cleaning, coating, leak-tightness testing, and final product release.

02

Multi-Stage Leak-Tightness and Leak Detection Testing

Testing includes leak detection on individual radiator panels, semi-finished products, and galvanized products, as well as liquid penetrant testing (PT) and final leak detection before shipment. The IEC standard requires underwater leak testing at 200 kPa for 30 minutes with no leakage; the Chinese national standard requires leak testing at 150 kPa for 20 minutes with no leakage.

03

Internal Cleanliness and Welding Process Control

During welding, the assembly tolerance between oil headers and radiator panels is controlled to ≤0.5 mm. Internal surfaces are flushed with solvent at high pressure before coating. After coating, bright-light and borescope inspections are performed. Before shipment, finished products are flushed with K125X transformer oil.

04

Coating Inspection and Adhesion Testing

Coating inspection: ① Use a cross-cut cutter to cut a grid through the coating down to the substrate. ② Brush five times along each of the two diagonals, then apply adhesive tape to the cut area and peel it off. ③ Inspect the grid area, using a magnifying glass if necessary. ④ Compare the cross-cut results with the standard reference classifications to assess adhesion (classifications above 2 are unacceptable).

Coating adhesion testing: ① ISO 2409 cross-cut test: classification below 1. ② ISO 4624 pull-off test: adhesion strength ≥5 MPa.

05

Color Difference and Coating Thickness Testing

Use a colorimeter to measure the color difference between the standard color panel and the paint film. Acceptance criterion: ΔE ≤2.0. In accordance with ISO 19840:2012, use a coating thickness gauge to take measurements at five selected points within an area of ≤1 m²; all measured values must meet customer requirements.

06

Professional Testing Equipment and Inspection Team

Testing equipment includes dimensional measuring tools, paint film thickness gauges, borescopes, leak detection water tanks, and transformer oil analyzers, all calibrated regularly. The company has 15 professional inspectors, all holding vocational skills certificates in quality management and inspection. They are proficient in inspection procedures covering the entire process, including hydrostatic testing, airtightness testing, coating inspection, and non-destructive testing.

07

Third-Party Inspection and Additional Testing

On-site inspections of the production process and critical operations by third-party organizations such as SGS, BV, and TÜV are supported. Additional testing and inspection, including ultrasonic testing, radiographic testing, coating thickness measurement, and dimensional inspection, can be arranged according to customer requirements.

Global service capabilities

Global Delivery and After-Sales Support

01

Warranty and Long-Term Spare Parts Support

The warranty period begins on the date the customer receives the goods, with a 12-month warranty covering the complete unit. Common accessories, including fan brackets, seals, air vent plugs, and flanges, remain available for five years to support long-term operation and maintenance.

Transformer Radiator Spare Parts and Accessories for Long-Term Warranty Support
02

Transportation Damage and After-Sales Handling

If a product is damaged during transportation, please notify us within 7 days of receipt and provide photographs of the damage and packaging condition, along with a cargo damage report issued by the carrier. The company will assist with insurance claims and provide replacement parts and after-sales support as needed.

Transformer Radiator Panel Inspection and Loading for International Shipping
03

Technical Support for Overseas Projects

Round-the-clock remote technical support is available by email, video conference, and telephone. The company has dedicated after-sales personnel available for overseas travel, can assist with visa procedures, and can provide further technical services according to project needs.

Remote Technical Consultation and Engineering Drawing Review for Overseas Projects
04

Factory Documentation and Multilingual Support

Bilingual Chinese-English factory inspection reports and installation, operation, and maintenance manuals are provided as standard. For specific projects, Spanish, Arabic, French, and other language versions can also be provided on request to support overseas project acceptance, installation, operation, and maintenance.

Multilingual Factory Documentation, Inspection Reports, and Operating Manuals
ENGINEERING & MANUFACTURING

Need Radiator Selection or Custom Engineering Support?

Share your transformer parameters, cooling requirements or project conditions. TQT's engineering team will support product selection and customized solutions.

TQT Engineering SupportGlobal Supply · Custom Manufacturing · Technical Support