Available Sizes
Center-to-center distance: 700–5,000 mm
Panel width: 535 mm, 520 mm (recommended), 480 mm, 381 mm
The company operates two smart manufacturing bases in Jiangsu and Zhejiang, along with a production and service base in Taiwan. With a total production area of approximately 56,000 m² and more than 10 automated processing and intelligent coating lines, the company can achieve peak monthly output of 5,000–6,500 metric tons and has an annual production capacity of 70,000 metric tons of transformer panel radiators.
Center-to-center distance: 700–5,000 mm
Panel width: 535 mm, 520 mm (recommended), 480 mm, 381 mm
SPCC Cold-Rolled Steel Sheet
Standard thicknesses: 1.0 mm, 1.2 mm
Maximum thickness: 1.5 mm
304 and 316 Stainless Steel
Standard thickness: 1.0 mm
Thicknesses up to 1.2 mm available on request
Hot-Dip Galvanizing / Electrophoretic Coating / Powder Coating / Paint Coating
ISO 1461:2009
ISO 12944 C3L–C5VH
Product quality and testing comply with standards including JB/T 5347-2013 and IEC 60076-22-2:2019. Quality management covers the entire process, including manufacturing, welding, cleaning, coating, leak-tightness testing, and final product release.
Testing includes leak detection on individual radiator panels, semi-finished products, and galvanized products, as well as liquid penetrant testing (PT) and final leak detection before shipment. The IEC standard requires underwater leak testing at 200 kPa for 30 minutes with no leakage; the Chinese national standard requires leak testing at 150 kPa for 20 minutes with no leakage.
During welding, the assembly tolerance between oil headers and radiator panels is controlled to ≤0.5 mm. Internal surfaces are flushed with solvent at high pressure before coating. After coating, bright-light and borescope inspections are performed. Before shipment, finished products are flushed with K125X transformer oil.
Coating inspection: ① Use a cross-cut cutter to cut a grid through the coating down to the substrate. ② Brush five times along each of the two diagonals, then apply adhesive tape to the cut area and peel it off. ③ Inspect the grid area, using a magnifying glass if necessary. ④ Compare the cross-cut results with the standard reference classifications to assess adhesion (classifications above 2 are unacceptable).
Coating adhesion testing: ① ISO 2409 cross-cut test: classification below 1. ② ISO 4624 pull-off test: adhesion strength ≥5 MPa.
Use a colorimeter to measure the color difference between the standard color panel and the paint film. Acceptance criterion: ΔE ≤2.0. In accordance with ISO 19840:2012, use a coating thickness gauge to take measurements at five selected points within an area of ≤1 m²; all measured values must meet customer requirements.
Testing equipment includes dimensional measuring tools, paint film thickness gauges, borescopes, leak detection water tanks, and transformer oil analyzers, all calibrated regularly. The company has 15 professional inspectors, all holding vocational skills certificates in quality management and inspection. They are proficient in inspection procedures covering the entire process, including hydrostatic testing, airtightness testing, coating inspection, and non-destructive testing.
On-site inspections of the production process and critical operations by third-party organizations such as SGS, BV, and TÜV are supported. Additional testing and inspection, including ultrasonic testing, radiographic testing, coating thickness measurement, and dimensional inspection, can be arranged according to customer requirements.
The warranty period begins on the date the customer receives the goods, with a 12-month warranty covering the complete unit. Common accessories, including fan brackets, seals, air vent plugs, and flanges, remain available for five years to support long-term operation and maintenance.
If a product is damaged during transportation, please notify us within 7 days of receipt and provide photographs of the damage and packaging condition, along with a cargo damage report issued by the carrier. The company will assist with insurance claims and provide replacement parts and after-sales support as needed.
Round-the-clock remote technical support is available by email, video conference, and telephone. The company has dedicated after-sales personnel available for overseas travel, can assist with visa procedures, and can provide further technical services according to project needs.
Bilingual Chinese-English factory inspection reports and installation, operation, and maintenance manuals are provided as standard. For specific projects, Spanish, Arabic, French, and other language versions can also be provided on request to support overseas project acceptance, installation, operation, and maintenance.
In addition to product supply, the company supports technology transfer and production line cooperation. The specific cooperation framework can be negotiated based on the customer's market, project scale, and local manufacturing requirements.
Technology Licensing / Joint Ventures / Technical Service Agreements / Production Line Cooperation
Share your transformer parameters, cooling requirements or project conditions. TQT's engineering team will support product selection and customized solutions.